No products in the cart.
Top picks this week. Up to 50% off the best selling products.
Showing all 3 resultsSorted by latest
Due to size of the panels and size of the gap between the slats of the pallets (both length and width entries) a fork lift truck on site is required to offload these modules. In Germany, this module may only be installed on building-independent solar systems in publicly inaccessible areas with a height of up to 3m.